PROJECTS

Shell Crux

2023-2025​

Shell Crux Unmanned Gas Platform: Full Telecoms Systems Integration (TSI) scope. Design, procurement, assembly, configuration, test, deliver, commission 20 packages. 1821 drawings and documents. 28 cabinets delivered in 13 months.

Project 1 CRX4

Woodside IROC

2024-2026

Design, Install, Commission and Integrate the Telecommunications and Communications systems for Woodside’s new Integrated Remote Operations Centre (IROC) and Alternative Remote Operations Centre (ARCC). At its heart, the control room fully controls 2 offshore assets and 2 onshore processing trains, and is a first of its kind anywhere in the world. WNA carried out works on this project including:

Woodside IROC

Santos Varanus Island MEO

2024-2025

Santos Varanus Island MEO System: installation support work with and for Marlink to produce documentation. Assistance with installation activities.

Project 3 MEO Ant Array(2)

Mineral Resources Onslow Iron

2023-2024

Mineral Resources Onslow Iron Project:  Assist Mineral Resources with high level design, preparation of specifications & scopes of work, tender bid evaluation, commissioning supervision for haul road telecommunications. Feasibility study and high level design for iron ore transfer barge communications to shore.

Project 4 IMG_1272

Woodside Pyrenees Microwave

2022-2024

BHP Petroleum/Woodside Pyrenees FPSO microwave upgrade: Assess/select study. Manage NCFAA process for shared use of Telstra Cape Range facility. Feasibility study, detailed design, procurement, FAT, SIT and SAT for 1m stabilised antenna microwave system link to shore.

Project 5 PRYN Cereagon Install Singapore

Woodside Scarborough

2022-2025

Woodside Scarborough Floating Production Unit (FPU) Project: Subcontracted to Viasat. Design, procurement, assembly, configuration, test, documentation for the radio packages. VHF marine band, VHF air band, UHF (DMR Tier III), radio console system, voice recording, GMDSS.

Project 6 SCA3

Pilbara Minerals Pilgangoora

2022-2025

Pilbara Minerals Pilgangoora Project: Microwave path profiles. Radio communications coverage studies. Communications Strategy. Specifications and Scopes of Work – towers, shelters, data centres, radio, microwave. Tender bid evaluation. Site Supervision.

Project 7 PLS01

Shell-QGC-Radio-Coverage-Studies

2022-ongoing

UHF TETRA and UHF telemetry radio coverage studies using Infovista Planet software across the extent of Shell QGC’s upstream operations in Queensland.  Each tranche of new wells is assessed for land mobile radio coverage and telemetry access point connectivity.  Potential infrastructure locations are modelled as necessary.

Project Feasibility Studies

Ongoing works

WNA have produced numerous Definitive Feasibility Studies (DFS), Bankable Feasibility Studies (BFS), Basis of Design (BoD) studies for telecoms for greenfields and brownfields projects.  These have included:

Strike Energy - South Eregulla Project

2025-2026

Design concept development for interconnection of Strike Energy assets to Western Power network.  Detailed design, documentation, procurement, configuration, assembly, test, installation and commissioning of shelter, DC power systems, microwave radio, multiplex and SEAL across three sites in accordance with Western Power product and design standards.

Telecommunications Cabinet Builds

Ongoing works

WNA have designed, procured, assembled, tested, packed and shipped a number of telecommunications cabinets including:

Shell Crux - Walk to Work Vessel

2025-2026

Shell awarded a contract to WNA to design and supply the Owner Furnished Equipment (telecoms) for the Walk to Work vessel which is being constructed by ST Engineering in Singapore.  This vessel will support the operations and maintenance of the Crux unmanned platform.

WNA undertook the detailed design, documentation, procurement, configuration, assembly, test and delivery of the following systems: